ONLINE EXCLUSIVES

BIA TO CONSTRUCT STERILISATION TUNNEL

A 20 feet long Sterilisation Tunnel to be constructed in BIA

A 20 feet long Sterilisation Tunnel to be constructed in BIA. All the arrival passengers will be taken in through the tunnel after the airport reopens. A Vaporized antiseptic will be sprayed in the tunnel for sterilisation.
The flight crew too will also have to walk through special sterilisation Chambers during arrivals and departures.

Related Articles

Back to top button